Carmike Cinema Project

  • Year: 2014
  • Client: CBL
  • Location: West Melbourne, Florida
  • Contract Amount: $2,000,544.00
  • Details: 14 acres of commercial new construction & two- lane with divided median modifications. Improvements consisted of demolition, site clearing, retention pond excavation, asphalt road base, stabilized sub-grade, concrete curb, storm drain, and underground utilities.

Carmike Cinema Project

  • Year: 2014
  • Client: CBL
  • Location: West Melbourne, Florida
  • Contract Amount: $2,000,544.00
  • Details: 14 acres of commercial new construction & two- lane with divided median modifications. Improvements consisted of demolition, site clearing, retention pond excavation, asphalt road base, stabilized sub-grade, concrete curb, storm drain, and underground utilities.

 

Carmike Cinema Project

  • Year: 2014
  • Client: CBL
  • Location: West Melbourne, Florida
  • Contract Amount: $2,000,544.00
  • Details: 14 acres of commercial new construction & two- lane with divided median modifications. Improvements consisted of demolition, site clearing, retention pond excavation, asphalt road base, stabilized sub-grade, concrete curb, storm drain, and underground utilities.

 

Carmike Cinema Project

  • Year: 2014
  • Client: CBL
  • Location: West Melbourne, Florida
  • Contract Amount: $2,000,544.00
  • Details: 14 acres of commercial new construction & two- lane with divided median modifications. Improvements consisted of demolition, site clearing, retention pond excavation, asphalt road base, stabilized sub-grade, concrete curb, storm drain, and underground utilities.

 

Carmike Cinema Project

  • Year: 2014
  • Client: CBL
  • Location: West Melbourne, Florida
  • Contract Amount: $2,000,544.00
  • Details: 14 acres of commercial new construction & two- lane with divided median modifications. Improvements consisted of demolition, site clearing, retention pond excavation, asphalt road base, stabilized sub-grade, concrete curb, storm drain, and underground utilities.

 

Carmike Cinema Project

  • Year: 2014
  • Client: CBL
  • Location: West Melbourne, Florida
  • Contract Amount: $2,000,544.00
  • Details: 14 acres of commercial new construction & two- lane with divided median modifications. Improvements consisted of demolition, site clearing, retention pond excavation, asphalt road base, stabilized sub-grade, concrete curb, storm drain, and underground utilities.

 

Carmike Cinema Project

  • Year: 2014
  • Client: CBL
  • Location: West Melbourne, Florida
  • Contract Amount: $2,000,544.00
  • Details: 14 acres of commercial new construction & two- lane with divided median modifications. Improvements consisted of demolition, site clearing, retention pond excavation, asphalt road base, stabilized sub-grade, concrete curb, storm drain, and underground utilities.

 

Carmike Cinema Project

  • Year: 2014
  • Client: CBL
  • Location: West Melbourne, Florida
  • Contract Amount: $2,000,544.00
  • Details: 14 acres of commercial new construction & two- lane with divided median modifications. Improvements consisted of demolition, site clearing, retention pond excavation, asphalt road base, stabilized sub-grade, concrete curb, storm drain, and underground utilities.

Carmike Cinema Project

  • Year: 2014
  • Client: CBL
  • Location: West Melbourne, Florida
  • Contract Amount: $2,000,544.00
  • Details: 14 acres of commercial new construction & two- lane with divided median modifications. Improvements consisted of demolition, site clearing, retention pond excavation, asphalt road base, stabilized sub-grade, concrete curb, storm drain, and underground utilities.

 

Carmike Cinema Project

  • Year: 2014
  • Client: CBL
  • Location: West Melbourne, Florida
  • Contract Amount: $2,000,544.00
  • Details: 14 acres of commercial new construction & two- lane with divided median modifications. Improvements consisted of demolition, site clearing, retention pond excavation, asphalt road base, stabilized sub-grade, concrete curb, storm drain, and underground utilities.

 

Cruise-Terminal 1 Port Canaveral

Port Canaveral CT-1

  • Year: 2014
  • Client: Ivey's Construction/Port Canaveral Authority
  • Location: Port Canaveral/Brevard County
  • Contract Amount: $3,574,894.00
  • Details: 30 acres of commercial new construction & offsite four lane divided median modifications. Improvements consisted of demolition, site clearing, asphalt, road base, sub-grade stabilization, concrete curb, pipe bollard installation, 18" - 60" storm drain, and underground utilities. Fast track project completed in seven months.
Cruise-Terminal 1 Port Canaveral
Cruise-Terminal 1 Port Canaveral

Port Canaveral CT-1

  • Year: 2014
  • Client: Ivey's Construction/Port Canaveral Authority
  • Location: Port Canaveral/Brevard County
  • Contract Amount: $3,574,894.00
  • Details: 30 acres of commercial new construction & offsite four lane divided median modifications. Improvements consisted of demolition, site clearing, asphalt, road base, sub-grade stabilization, concrete curb, pipe bollard installation, 18" - 60" storm drain, and underground utilities. Fast track project completed in seven months.
Cruise-Terminal 1 Port Canaveral
Cruise-Terminal 1 Port Canaveral

Port Canaveral CT-1

  • Year: 2014
  • Client: Ivey's Construction/Port Canaveral Authority
  • Location: Port Canaveral/Brevard County
  • Contract Amount: $3,574,894.00
  • Details: 30 acres of commercial new construction & offsite four lane divided median modifications. Improvements consisted of demolition, site clearing, asphalt, road base, sub-grade stabilization, concrete curb, pipe bollard installation, 18" - 60" storm drain, and underground utilities. Fast track project completed in seven months.
Cruise-Terminal 1 Port Canaveral
Cruise-Terminal 1 Port Canaveral

Port Canaveral CT-1

  • Year: 2014
  • Client: Ivey's Construction/Port Canaveral Authority
  • Location: Port Canaveral/Brevard County
  • Contract Amount: $3,574,894.00
  • Details: 30 acres of commercial new construction & offsite four lane divided median modifications. Improvements consisted of demolition, site clearing, asphalt, road base, sub-grade stabilization, concrete curb, pipe bollard installation, 18" - 60" storm drain, and underground utilities. Fast track project completed in seven months.
Cruise-Terminal 1 Port Canaveral
Cruise-Terminal 1 Port Canaveral

Port Canaveral CT-1

  • Year: 2014
  • Client: Ivey's Construction/Port Canaveral Authority
  • Location: Port Canaveral/Brevard County
  • Contract Amount: $3,574,894.00
  • Details: 30 acres of commercial new construction & offsite four lane divided median modifications. Improvements consisted of demolition, site clearing, asphalt, road base, sub-grade stabilization, concrete curb, pipe bollard installation, 18" - 60" storm drain, and underground utilities. Fast track project completed in seven months.
Cruise-Terminal 1 Port Canaveral
Cruise-Terminal 1 Port Canaveral

Port Canaveral CT-1

  • Year: 2014
  • Client: Ivey's Construction/Port Canaveral Authority
  • Location: Port Canaveral/Brevard County
  • Contract Amount: $3,574,894.00
  • Details: 30 acres of commercial new construction & offsite four lane divided median modifications. Improvements consisted of demolition, site clearing, asphalt, road base, sub-grade stabilization, concrete curb, pipe bollard installation, 18" - 60" storm drain, and underground utilities. Fast track project completed in seven months.
Cruise-Terminal 1 Port Canaveral
Cruise-Terminal 1 Port Canaveral

Port Canaveral CT-1

  • Year: 2014
  • Client: Ivey's Construction/Port Canaveral Authority
  • Location: Port Canaveral/Brevard County
  • Contract Amount: $3,574,894.00
  • Details: 30 acres of commercial new construction & offsite four lane divided median modifications. Improvements consisted of demolition, site clearing, asphalt, road base, sub-grade stabilization, concrete curb, pipe bollard installation, 18" - 60" storm drain, and underground utilities. Fast track project completed in seven months.
Cruise-Terminal 1 Port Canaveral
Cruise-Terminal 1 Port Canaveral

Port Canaveral CT-1

  • Year: 2014
  • Client: Ivey's Construction/Port Canaveral Authority
  • Location: Port Canaveral/Brevard County
  • Contract Amount: $3,574,894.00
  • Details: 30 acres of commercial new construction & offsite four lane divided median modifications. Improvements consisted of demolition, site clearing, asphalt, road base, sub-grade stabilization, concrete curb, pipe bollard installation, 18" - 60" storm drain, and underground utilities. Fast track project completed in seven months.
Cruise-Terminal 1 Port Canaveral
Cruise-Terminal 1 Port Canaveral

Port Canaveral CT-1

  • Year: 2014
  • Client: Ivey's Construction/Port Canaveral Authority
  • Location: Port Canaveral/Brevard County
  • Contract Amount: $3,574,894.00
  • Details: 30 acres of commercial new construction & offsite four lane divided median modifications. Improvements consisted of demolition, site clearing, asphalt, road base, sub-grade stabilization, concrete curb, pipe bollard installation, 18" - 60" storm drain, and underground utilities. Fast track project completed in seven months.
Cruise-Terminal 1 Port Canaveral
Cruise-Terminal 1 Port Canaveral

Port Canaveral CT-1

  • Year: 2014
  • Client: Ivey's Construction/Port Canaveral Authority
  • Location: Port Canaveral/Brevard County
  • Contract Amount: $3,574,894.00
  • Details: 30 acres of commercial new construction & offsite four lane divided median modifications. Improvements consisted of demolition, site clearing, asphalt, road base, sub-grade stabilization, concrete curb, pipe bollard installation, 18" - 60" storm drain, and underground utilities. Fast track project completed in seven months.
Cruise-Terminal 1 Port Canaveral
Cruise-Terminal 1 Port Canaveral

Port Canaveral CT-1

  • Year: 2014
  • Client: Ivey's Construction/Port Canaveral Authority
  • Location: Port Canaveral/Brevard County
  • Contract Amount: $3,574,894.00
  • Details: 30 acres of commercial new construction & offsite four lane divided median modifications. Improvements consisted of demolition, site clearing, asphalt, road base, sub-grade stabilization, concrete curb, pipe bollard installation, 18" - 60" storm drain, and underground utilities. Fast track project completed in seven months.
Cruise-Terminal 1 Port Canaveral
Cruise-Terminal 1 Port Canaveral

Port Canaveral CT-1

  • Year: 2014
  • Client: Ivey's Construction/Port Canaveral Authority
  • Location: Port Canaveral/Brevard County
  • Contract Amount: $3,574,894.00
  • Details: 30 acres of commercial new construction & offsite four lane divided median modifications. Improvements consisted of demolition, site clearing, asphalt, road base, sub-grade stabilization, concrete curb, pipe bollard installation, 18" - 60" storm drain, and underground utilities. Fast track project completed in seven months.
Cruise-Terminal 1 Port Canaveral
Cruise-Terminal 1 Port Canaveral

Port Canaveral CT-1

  • Year: 2014
  • Client: Ivey's Construction/Port Canaveral Authority
  • Location: Port Canaveral/Brevard County
  • Contract Amount: $3,574,894.00
  • Details: 30 acres of commercial new construction & offsite four lane divided median modifications. Improvements consisted of demolition, site clearing, asphalt, road base, sub-grade stabilization, concrete curb, pipe bollard installation, 18" - 60" storm drain, and underground utilities. Fast track project completed in seven months.
Cruise-Terminal 1 Port Canaveral
Cruise-Terminal 1 Port Canaveral

Port Canaveral CT-1

  • Year: 2014
  • Client: Ivey's Construction/Port Canaveral Authority
  • Location: Port Canaveral/Brevard County
  • Contract Amount: $3,574,894.00
  • Details: 30 acres of commercial new construction & offsite four lane divided median modifications. Improvements consisted of demolition, site clearing, asphalt, road base, sub-grade stabilization, concrete curb, pipe bollard installation, 18" - 60" storm drain, and underground utilities. Fast track project completed in seven months.
Cruise-Terminal 1 Port Canaveral
Cruise-Terminal 1 Port Canaveral

Port Canaveral CT-1

  • Year: 2014
  • Client: Ivey's Construction/Port Canaveral Authority
  • Location: Port Canaveral/Brevard County
  • Contract Amount: $3,574,894.00
  • Details: 30 acres of commercial new construction & offsite four lane divided median modifications. Improvements consisted of demolition, site clearing, asphalt, road base, sub-grade stabilization, concrete curb, pipe bollard installation, 18" - 60" storm drain, and underground utilities. Fast track project completed in seven months.
Cruise-Terminal 1 Port Canaveral

Port Canaveral CT-1

  • Year: 2014
  • Client: Ivey's Construction/Port Canaveral Authority
  • Location: Port Canaveral/Brevard County
  • Contract Amount: $3,574,894.00
  • Details: 30 acres of commercial new construction & offsite four lane divided median modifications. Improvements consisted of demolition, site clearing, asphalt, road base, sub-grade stabilization, concrete curb, pipe bollard installation, 18" - 60" storm drain, and underground utilities. Fast track project completed in seven months.
Cruise-Terminal 1 Port Canaveral

Port Canaveral CT-1

  • Year: 2014
  • Client: Ivey's Construction/Port Canaveral Authority
  • Location: Port Canaveral/Brevard County
  • Contract Amount: $3,574,894.00
  • Details: 30 acres of commercial new construction & offsite four lane divided median modifications. Improvements consisted of demolition, site clearing, asphalt, road base, sub-grade stabilization, concrete curb, pipe bollard installation, 18" - 60" storm drain, and underground utilities. Fast track project completed in seven months.
Cruise-Terminal 1 Port Canaveral
Cruise-Terminal 1 Port Canaveral

Port Canaveral CT-1

  • Year: 2014
  • Client: Ivey's Construction/Port Canaveral Authority
  • Location: Port Canaveral/Brevard County
  • Contract Amount: $3,574,894.00
  • Details: 30 acres of commercial new construction & offsite four lane divided median modifications. Improvements consisted of demolition, site clearing, asphalt, road base, sub-grade stabilization, concrete curb, pipe bollard installation, 18" - 60" storm drain, and underground utilities. Fast track project completed in seven months.
Cruise-Terminal 1 Port Canaveral
Cruise-Terminal 1 Port Canaveral

Port Canaveral CT-1

  • Year: 2014
  • Client: Ivey's Construction/Port Canaveral Authority
  • Location: Port Canaveral/Brevard County
  • Contract Amount: $3,574,894.00
  • Details: 30 acres of commercial new construction & offsite four lane divided median modifications. Improvements consisted of demolition, site clearing, asphalt, road base, sub-grade stabilization, concrete curb, pipe bollard installation, 18" - 60" storm drain, and underground utilities. Fast track project completed in seven months.
Cruise-Terminal 1 Port Canaveral
Cruise-Terminal 1 Port Canaveral

Port Canaveral CT-1

  • Year: 2014
  • Client: Ivey's Construction/Port Canaveral Authority
  • Location: Port Canaveral/Brevard County
  • Contract Amount: $3,574,894.00
  • Details: 30 acres of commercial new construction & offsite four lane divided median modifications. Improvements consisted of demolition, site clearing, asphalt, road base, sub-grade stabilization, concrete curb, pipe bollard installation, 18" - 60" storm drain, and underground utilities. Fast track project completed in seven months.
Cruise-Terminal 1 Port Canaveral
Cruise-Terminal 1 Port Canaveral

Port Canaveral CT-1

  • Year: 2014
  • Client: Ivey's Construction/Port Canaveral Authority
  • Location: Port Canaveral/Brevard County
  • Contract Amount: $3,574,894.00
  • Details: 30 acres of commercial new construction & offsite four lane divided median modifications. Improvements consisted of demolition, site clearing, asphalt, road base, sub-grade stabilization, concrete curb, pipe bollard installation, 18" - 60" storm drain, and underground utilities. Fast track project completed in seven months.
Cruise-Terminal 1 Port Canaveral
Embraer Assembly Building

Embraer Assembly Building

  • Year: 2013
  • Client: Walbridge
  • Location: Melbourne, Florida
  • Contract Amount: $1,134,633.00
  • Details: 17 acres of commercial new construction with 4-lane divided median road way, 2-lane road way, offsite airport aprons. Activities consisted of demolition, site clearing, dry retention pond excavation, asphalt, road base, stabilized sub-grade, concrete curb, storm drain, underground utilities, and landscaping/irrigation. One of seven phases completed for Embraer at the Melbourne Airport.
Embraer Assembly Building
Embraer Assembly Building

Embraer Assembly Building

  • Year: 2013
  • Client: Walbridge
  • Location: Melbourne, Florida
  • Contract Amount: $1,134,633.00
  • Details: 17 acres of commercial new construction with 4-lane divided median road way, 2-lane road way, offsite airport aprons. Activities consisted of demolition, site clearing, dry retention pond excavation, asphalt, road base, stabilized sub-grade, concrete curb, storm drain, underground utilities, and landscaping/irrigation. One of seven phases completed for Embraer at the Melbourne Airport.
Embraer Assembly Building
Embraer Assembly Building

Embraer Assembly Building

  • Year: 2013
  • Client: Walbridge
  • Location: Melbourne, Florida
  • Contract Amount: $1,134,633.00
  • Details: 17 acres of commercial new construction with 4-lane divided median road way, 2-lane road way, offsite airport aprons. Activities consisted of demolition, site clearing, dry retention pond excavation, asphalt, road base, stabilized sub-grade, concrete curb, storm drain, underground utilities, and landscaping/irrigation. One of seven phases completed for Embraer at the Melbourne Airport.
Embraer Assembly Building
Embraer Assembly Building

Embraer Assembly Building

  • Year: 2013
  • Client: Walbridge
  • Location: Melbourne, Florida
  • Contract Amount: $1,134,633.00
  • Details: 17 acres of commercial new construction with 4-lane divided median road way, 2-lane road way, offsite airport aprons. Activities consisted of demolition, site clearing, dry retention pond excavation, asphalt, road base, stabilized sub-grade, concrete curb, storm drain, underground utilities, and landscaping/irrigation. One of seven phases completed for Embraer at the Melbourne Airport.
Embraer Assembly Building
Embraer Assembly Building

Embraer Assembly Building

  • Year: 2013
  • Client: Walbridge
  • Location: Melbourne, Florida
  • Contract Amount: $1,134,633.00
  • Details: 17 acres of commercial new construction with 4-lane divided median road way, 2-lane road way, offsite airport aprons. Activities consisted of demolition, site clearing, dry retention pond excavation, asphalt, road base, stabilized sub-grade, concrete curb, storm drain, underground utilities, and landscaping/irrigation. One of seven phases completed for Embraer at the Melbourne Airport.
Embraer Assembly Building
Embraer Delivery Building

Embraer Delivery Building

  • Year: 2013
  • Client: Walbridge
  • Location: Melbourne, Florida
  • Contract Amount: $1,134,633.00
  • Details: 17 acres of commercial new construction with 4-lane divided median road way, 2-lane road way, offsite airport aprons. Activities consisted of demolition, site clearing, dry retention pond excavation, asphalt, road base, stabilized sub-grade, concrete curb, storm drain, underground utilities, and landscaping/irrigation. One of seven phases completed for Embraer at the Melbourne Airport.
Embraer Delivery Building
Embraer Delivery Building

Embraer Delivery Building

  • Year: 2013
  • Client: Walbridge
  • Location: Melbourne, Florida
  • Contract Amount: $1,134,633.00
  • Details: 17 acres of commercial new construction with 4-lane divided median road way, 2-lane road way, offsite airport aprons. Activities consisted of demolition, site clearing, dry retention pond excavation, asphalt, road base, stabilized sub-grade, concrete curb, storm drain, underground utilities, and landscaping/irrigation. One of seven phases completed for Embraer at the Melbourne Airport.
Embraer Delivery Building
Embraer Delivery Building

Embraer Delivery Building

  • Year: 2013
  • Client: Walbridge
  • Location: Melbourne, Florida
  • Contract Amount: $1,134,633.00
  • Details: 17 acres of commercial new construction with 4-lane divided median road way, 2-lane road way, offsite airport aprons. Activities consisted of demolition, site clearing, dry retention pond excavation, asphalt, road base, stabilized sub-grade, concrete curb, storm drain, underground utilities, and landscaping/irrigation. One of seven phases completed for Embraer at the Melbourne Airport.
Embraer Delivery Building
Embraer Delivery Building

Embraer Delivery Building

  • Year: 2013
  • Client: Walbridge
  • Location: Melbourne, Florida
  • Contract Amount: $1,134,633.00
  • Details: 17 acres of commercial new construction with 4-lane divided median road way, 2-lane road way, offsite airport aprons. Activities consisted of demolition, site clearing, dry retention pond excavation, asphalt, road base, stabilized sub-grade, concrete curb, storm drain, underground utilities, and landscaping/irrigation. One of seven phases completed for Embraer at the Melbourne Airport.
Embraer Delivery Building
Embraer Delivery Building

Embraer Delivery Building

  • Year: 2013
  • Client: Walbridge
  • Location: Melbourne, Florida
  • Contract Amount: $1,134,633.00
  • Details: 17 acres of commercial new construction with 4-lane divided median road way, 2-lane road way, offsite airport aprons. Activities consisted of demolition, site clearing, dry retention pond excavation, asphalt, road base, stabilized sub-grade, concrete curb, storm drain, underground utilities, and landscaping/irrigation. One of seven phases completed for Embraer at the Melbourne Airport.
Embraer Delivery Building
Embraer Delivery Building

Embraer Delivery Building

  • Year: 2013
  • Client: Walbridge
  • Location: Melbourne, Florida
  • Contract Amount: $1,134,633.00
  • Details: 17 acres of commercial new construction with 4-lane divided median road way, 2-lane road way, offsite airport aprons. Activities consisted of demolition, site clearing, dry retention pond excavation, asphalt, road base, stabilized sub-grade, concrete curb, storm drain, underground utilities, and landscaping/irrigation. One of seven phases completed for Embraer at the Melbourne Airport.
Embraer Delivery Building
Embraer Delivery Building

Embraer Delivery Building

  • Year: 2013
  • Client: Walbridge
  • Location: Melbourne, Florida
  • Contract Amount: $1,134,633.00
  • Details: 17 acres of commercial new construction with 4-lane divided median road way, 2-lane road way, offsite airport aprons. Activities consisted of demolition, site clearing, dry retention pond excavation, asphalt, road base, stabilized sub-grade, concrete curb, storm drain, underground utilities, and landscaping/irrigation. One of seven phases completed for Embraer at the Melbourne Airport.
Embraer Delivery Building
Embraer Engineering Building

Embraer Engineering Building

Embraer Engineering Building
Embraer Engineering Building

Embraer Engineering Building

Embraer Engineering Building
Embraer Engineering Building

Embraer Engineering Building

Embraer Engineering Building
Embraer Engineering Building

Embraer Engineering Building

Embraer Engineering Building
Embraer Engineering Building

Embraer Engineering Building

Embraer Engineering Building
FIT Aviation

FIT Aviation

FIT Aviation
FIT Aviation

FIT Aviation

FIT Aviation
FIT Aviation

FIT Aviation

FIT Aviation
FIT Aviation

FIT Aviation

FIT Aviation
FIT Aviation

FIT Aviation

FIT Aviation
FIT Aviation

FIT Aviation

FIT Aviation
FIT Aviation

FIT Aviation

FIT Aviation
Harris HTC

Harris HTC Project

  • Year: 2013/2014
  • Client: Balfour Beatty/Harris Corporation
  • Location: Palm Bay, Florida
  • Contract Amount: $4,608,176.00
  • Details: 36 acres of commercial new construction. Activities consisted of demolition of existing underground utilities and asphalt parking lots/roadways, site clearing, wet retention ponds, modification to existing retention ponds, excavation, asphalt, road base, stabilized sub-grade, concrete curb, storm drain, underground utilities, and new lift station.
Harris HTC
Harris HTC

Harris HTC Project

  • Year: 2013/2014
  • Client: Balfour Beatty/Harris Corporation
  • Location: Palm Bay, Florida
  • Contract Amount: $4,608,176.00
  • Details: 36 acres of commercial new construction. Activities consisted of demolition of existing underground utilities and asphalt parking lots/roadways, site clearing, wet retention ponds, modification to existing retention ponds, excavation, asphalt, road base, stabilized sub-grade, concrete curb, storm drain, underground utilities, and new lift station.
Harris HTC
Harris HTC

Harris HTC Project

  • Year: 2013/2014
  • Client: Balfour Beatty/Harris Corporation
  • Location: Palm Bay, Florida
  • Contract Amount: $4,608,176.00
  • Details: 36 acres of commercial new construction. Activities consisted of demolition of existing underground utilities and asphalt parking lots/roadways, site clearing, wet retention ponds, modification to existing retention ponds, excavation, asphalt, road base, stabilized sub-grade, concrete curb, storm drain, underground utilities, and new lift station.
Harris HTC
Harris HTC

Harris HTC Project

  • Year: 2013/2014
  • Client: Balfour Beatty/Harris Corporation
  • Location: Palm Bay, Florida
  • Contract Amount: $4,608,176.00
  • Details: 36 acres of commercial new construction. Activities consisted of demolition of existing underground utilities and asphalt parking lots/roadways, site clearing, wet retention ponds, modification to existing retention ponds, excavation, asphalt, road base, stabilized sub-grade, concrete curb, storm drain, underground utilities, and new lift station.
Harris HTC
Harris HTC

Harris HTC Project

  • Year: 2013/2014
  • Client: Balfour Beatty/Harris Corporation
  • Location: Palm Bay, Florida
  • Contract Amount: $4,608,176.00
  • Details: 36 acres of commercial new construction. Activities consisted of demolition of existing underground utilities and asphalt parking lots/roadways, site clearing, wet retention ponds, modification to existing retention ponds, excavation, asphalt, road base, stabilized sub-grade, concrete curb, storm drain, underground utilities, and new lift station.
Harris HTC
Harris HTC

Harris HTC Project

  • Year: 2013/2014
  • Client: Balfour Beatty/Harris Corporation
  • Location: Palm Bay, Florida
  • Contract Amount: $4,608,176.00
  • Details: 36 acres of commercial new construction. Activities consisted of demolition of existing underground utilities and asphalt parking lots/roadways, site clearing, wet retention ponds, modification to existing retention ponds, excavation, asphalt, road base, stabilized sub-grade, concrete curb, storm drain, underground utilities, and new lift station.
Harris HTC
Keiser College

Keiser College

Keiser College
Keiser College

Keiser College

Keiser College
Keiser College

Keiser College

Keiser College
Keiser College

Keiser College

Keiser College
Keiser College

Keiser College

Keiser College
Keiser College

Keiser College

Keiser College
Keiser College

Keiser College

Keiser College
Melbourne Airport Cargo & Apron

Melbourne Airport Cargo & Apron Project

  • Year: 2014
  • Client: Melbourne Airport Authority
  • Location: Melbourne, Florida
  • Contract Amount: $5,508,609.00
  • Details: 25 acres of airport apron new construction and taxiway modifications. Task completed; demolition of existing asphalt and concrete, dry retention ponds with under drain system, 10" & 14" reinforced high strength concrete apron, asphalt taxiways, taxiway lighting, storm drain, excavating/grading, asphalt aprons, road base, sub-grade stabilization, airport perimeter fencing, building pad preparation, fuel tank demolition and relocation.
Melbourne Airport Cargo & Apron
Melbourne Airport Cargo & Apron

Melbourne Airport Cargo & Apron Project

  • Year: 2014
  • Client: Melbourne Airport Authority
  • Location: Melbourne, Florida
  • Contract Amount: $5,508,609.00
  • Details: 25 acres of airport apron new construction and taxiway modifications. Task completed; demolition of existing asphalt and concrete, dry retention ponds with under drain system, 10" & 14" reinforced high strength concrete apron, asphalt taxiways, taxiway lighting, storm drain, excavating/grading, asphalt aprons, road base, sub-grade stabilization, airport perimeter fencing, building pad preparation, fuel tank demolition and relocation.
Melbourne Airport Cargo & Apron
Melbourne Airport Cargo & Apron

Melbourne Airport Cargo & Apron Project

  • Year: 2014
  • Client: Melbourne Airport Authority
  • Location: Melbourne, Florida
  • Contract Amount: $5,508,609.00
  • Details: 25 acres of airport apron new construction and taxiway modifications. Task completed; demolition of existing asphalt and concrete, dry retention ponds with under drain system, 10" & 14" reinforced high strength concrete apron, asphalt taxiways, taxiway lighting, storm drain, excavating/grading, asphalt aprons, road base, sub-grade stabilization, airport perimeter fencing, building pad preparation, fuel tank demolition and relocation.
Melbourne Airport Cargo & Apron
Melbourne Airport Cargo & Apron

Melbourne Airport Cargo & Apron Project

  • Year: 2014
  • Client: Melbourne Airport Authority
  • Location: Melbourne, Florida
  • Contract Amount: $5,508,609.00
  • Details: 25 acres of airport apron new construction and taxiway modifications. Task completed; demolition of existing asphalt and concrete, dry retention ponds with under drain system, 10" & 14" reinforced high strength concrete apron, asphalt taxiways, taxiway lighting, storm drain, excavating/grading, asphalt aprons, road base, sub-grade stabilization, airport perimeter fencing, building pad preparation, fuel tank demolition and relocation.
Melbourne Airport Cargo & Apron
Melbourne Airport Cargo & Apron

Melbourne Airport Cargo & Apron Project

  • Year: 2014
  • Client: Melbourne Airport Authority
  • Location: Melbourne, Florida
  • Contract Amount: $5,508,609.00
  • Details: 25 acres of airport apron new construction and taxiway modifications. Task completed; demolition of existing asphalt and concrete, dry retention ponds with under drain system, 10" & 14" reinforced high strength concrete apron, asphalt taxiways, taxiway lighting, storm drain, excavating/grading, asphalt aprons, road base, sub-grade stabilization, airport perimeter fencing, building pad preparation, fuel tank demolition and relocation.
Melbourne Airport Cargo & Apron
Melbourne Airport Cargo & Apron

Melbourne Airport Cargo & Apron Project

  • Year: 2014
  • Client: Melbourne Airport Authority
  • Location: Melbourne, Florida
  • Contract Amount: $5,508,609.00
  • Details: 25 acres of airport apron new construction and taxiway modifications. Task completed; demolition of existing asphalt and concrete, dry retention ponds with under drain system, 10" & 14" reinforced high strength concrete apron, asphalt taxiways, taxiway lighting, storm drain, excavating/grading, asphalt aprons, road base, sub-grade stabilization, airport perimeter fencing, building pad preparation, fuel tank demolition and relocation.
Melbourne Airport Cargo & Apron
WaWa Gas Station

WaWa Gas Station

  • Year: 2012
  • Client: RMC Reality Services
  • Location: Orange County
  • Contract Amount: $493,460.00
  • Details: 5 acres of commercial new construction & two- lane county right of way. Improvements consisted of demolition, site clearing, retention pond excavation, asphalt road base, stabilized sub-grade, concrete curb, cast in place retaining walls, storm drain, and underground utilities. One of four Wawa projects completed for RMC.
WaWa Gas Station